1. Construction setting out According to the plan of the aluminum veneer ceiling, the vertical and horizontal layout lines of the component materials, the contour lines of the parts with more complex shapes, and the ceiling elevation line are popped up; at the same time, the ceiling suspension points are determined and marked. 2. The fastening treatment of the suspended ceiling adopts metal expansion bolts or nails to fix the suspended ceiling connection according to the design requirements, or directly fix the steel suspenders, galvanized iron wires and flat iron hangers, etc. 3. Combination and assembly of hyperbolic aluminum veneer monomers Assembly of partial hyperbolic aluminum veneers: monomer and monomer, unit and unit, as a rhythmic pattern constituent factor of the hyperbolic aluminum veneer ceiling, if necessary It should be assembled on the ground as much as possible, and then suspended according to the design requirements.
In order to ensure that the components are connected firmly, Jiuzheng Home Network recommends that nailing, gluing, tenon joints, and square wood or iron parts should be used for reinforcement according to the relevant technical requirements of carpentry. 4. Hoisting, leveling and fixing of the hyperbolic aluminum veneer: After the wooden and aluminum veneer is in place, before kicking off the top surface to connect and fasten, the hard-drawn wire is leveled according to the design elevation of the ceiling, and the lower convex part is dragged up for use. The suspender is tightened, loosen the suspender on the concave part to move down, and then reinforce the hyperbolic aluminum veneer. It is reminded that for aluminum veneer ceilings with compact grid arrangement and large two-way span, the central part of the entire ceiling surface should also be slightly arched.
5. Installation points: (1) Installation of suspenders: steel suspenders and reserved steel suspenders are welded and lengthened. (2) Installation of the keel: Pull out the control line on the top surface of the keel according to the ceiling elevation line, the dimensional relationship between the top surface of the keel and the bottom surface of the ceiling, and then use the hanging parts to adjust the elevation and level of the keel until it meets the requirements. (3) Installation of aluminum veneer: first pull out the intersecting plane datum line with a thin nylon wire, start from a corner of the wall during installation, hold up the sub-ceiling, the height is slightly higher than the elevation line, and temporarily fix the sub-ceiling , Level the ceiling slices according to the baseline. When the ceiling area is greater than 100m2, there should be a certain amount of arching on the ceiling surface, and the amount of arching is generally about 1/3000 of the span.
Fix the leveled suspenders in pieces first, and then fix the pieces with connectors. (4) Make overall adjustments. Pull out multiple parallel or vertical reference lines along the elevation line, adjust the ceiling as a whole according to the reference lines, and check whether the amount of arching on the ceiling surface is correct.
Check the installation and layout, and correct the deformation of the monomer itself due to installation. Check whether the fixing parts of each connecting part are reliable, and reinforce some parts where the force is concentrated. Hyperbolic aluminum veneer,.